Uckfield Garage enlisted the services of Autoquip to design, supply, install, refit and project manage their relocation to larger premises.

Through dealing with various agencies, a market-leading Crypton class I, II and IV ATL MOT bay was installed onto a specifically designed plinth with the assistance of our partners, Bespoke GB.  In addition, an energy efficient Hertz 4kW compressor with Prevost compressed air network materials was the preferred choice, furnishing the client with clean dried air. Some of the client’s existing equipment was utilised and refitted into the workshop, tested and re-commissioned in addition to a newly supplied EAE 4000kg 2-post lift.  We wish John and Caroline all the very best in their new premises and thank them for the business. 

Installation Equipment

Client Testimonial

"With the daunting prospect of having to install a new MOT bay, we approached Autoquip for their assistance. From negotiation and planning through to completion, we were completely satisfied with their services.

John Harrop managed the project from initial conception to completion.  He negotiated with suppliers, contractors and the DVSA to ensure the project ran smoothly. 

The Autoquip the team on site were excellent.  Everything was completed to a high standard and in a professional manner. 

Autoquip are knowledgeable and reliable and would not hesitate to recommend their services."

John (Director - August 2020)

Installation Transformation

Installation Gallery

27 Aug, 2020
Uckfield Garage enlisted the services of Autoquip to design , supply , install , refit and project manage their relocation to larger premises. Through dealing with various agencies, a market-leading Crypton class I, II and IV ATL MOT bay was installed onto a specifically designed plinth with the assistance of our partners, Bespoke GB. In addition, an energy efficient Hertz 4kW compressor with Prevost compressed air network materials was the preferred choice, furnishing the client with clean dried air. Some of the client’s existing equipment was utilised and refitted into the workshop , tested and re-commissioned in addition to a newly supplied EAE 4000kg 2-post lift. We wish John and Caroline all the very best in their new premises and thank them for the business.
by websitebuilder 17 Aug, 2020
Autoquip's brief was to supply and install a new class 4 one person test lane through utilising the clients existing Rotary 4 post service lift. Autoquip were tasked with a relocation of the exisiting 4 post lift to the correct position within the workshop, relocate existing compressor and finish the installation by paint DVSA floor markings.