Blog Layout

Install at Ashford MOT Centre

Autoquip (GB) Garage Equipment Ltd were instructed by Ashford MOT Centre to upgrade and install 3 new Connected Automated Brake Testers (2x Class 7 and 1x Class4) into their busy MOT only site.

We have been managing the equipment and servicing of all equipment used at Ashford MOT Centre, therefore this was another job for our top installation team complete with attention to detail.

The new brake tester accompanies the sites Bradbury Lifts and the Crypton Emissions Analyser.

Installation Equipment

Client Testimonial

"Autoquip have implemented their aftercare package and support on our existing equipment for over 20 years. Due to the recent changes in requiring to upgrade our Brake Tester, Autoquip was always our first "one stop shop" due to the high level of experience they have as a business throughout the process. We recommend Autoquip for any new or upgrade of equipment at your workshop"

Sue (Director - June 2020)

Installation Transformation

Installation Gallery

27 Aug, 2020
Uckfield Garage enlisted the services of Autoquip to design , supply , install , refit and project manage their relocation to larger premises. Through dealing with various agencies, a market-leading Crypton class I, II and IV ATL MOT bay was installed onto a specifically designed plinth with the assistance of our partners, Bespoke GB. In addition, an energy efficient Hertz 4kW compressor with Prevost compressed air network materials was the preferred choice, furnishing the client with clean dried air. Some of the client’s existing equipment was utilised and refitted into the workshop , tested and re-commissioned in addition to a newly supplied EAE 4000kg 2-post lift. We wish John and Caroline all the very best in their new premises and thank them for the business.
by websitebuilder 17 Aug, 2020
Autoquip's brief was to supply and install a new class 4 one person test lane through utilising the clients existing Rotary 4 post service lift. Autoquip were tasked with a relocation of the exisiting 4 post lift to the correct position within the workshop, relocate existing compressor and finish the installation by paint DVSA floor markings.
Share by: